Xiamen E-star Energy Co., Ltd. HERF-600
On the register XIAME/09127/V1/A4
This PV device appears on the Energy Networks Association’s Connect Direct type test register, published 27 Mar 2024. Being on it is a fact about the register, not our endorsement and not a verdict on any product built around it.
What the register records
| System reference | XIAME/09127/V1/A4 |
|---|---|
| Manufacturer, as registered | Xiamen E-star Energy Co., Ltd. |
| Model, as registered | HERF-600 |
| Device type | PV |
| Device category | Inverter |
| Registered capacity | 0.6 kW |
| Phases | 1 |
| G98 version (GB) | 0 |
| G99 version (GB) | 0 |
| Published on the register | 27 Mar 2024 |
What has changed since we started watching
We mirror the register daily and keep an append-only record of what moved. Only the fields whose meaning is unambiguous appear here. Dates below are when we observed something, not when the manufacturer did it — the first line on most devices is simply the day this register first entered our mirror, which is why it is often far later than the published date above.
| 29 Aug 2026 | First seen in our mirror of the register. |
|---|
What this tells you
The inverter or PV device has been type tested against G98 or G99 — the engineering rules for generating alongside the grid, including the anti-islanding test.
And what it does not. This register covers the equipment. It is not the MCS product register and it is not the MCS installer register, and it is MCS certification — not this — that a supplier asks for before paying you a Smart Export Guarantee tariff.
The rules that apply
A rooftop system is a fixed installation notified under G98 or G99. MCS certification of the product and the installer is separate, and is what a supplier requires before paying an export tariff under the Smart Export Guarantee. Nothing in SI 2026/848 applies here.
Look up something else
Search the rooftop solar register by manufacturer, by the model code on the label, or by system reference.
Source: ENA Connect Direct type test register, Energy Networks Association. We mirror it and never edit it. We first saw this entry on 29 Aug 2026 and last confirmed it present on 29 Aug 2026.